Bennu specific Setup
- 1.1 res_process_img
- 1.2 PolyCam process_fits
- 1.3 NavCam process_fits
process-01 |
SOR.5001 |
Keyword |
process-02 P |
SOR.5002 |
Keyword |
process-02 M |
SOR.5002 |
Keyword |
process-03 N |
SOR.5003 |
Dark |
process-03 P |
SOR.5003 |
Dark |
process-03 M |
SOR.5003 |
Dark |
process-04 N |
SOR.5004 |
Crop |
process-04 P |
SOR.5004 |
Crop |
process-04 M |
SOR.5004 |
Crop |
process-05 N |
SOR.5005 |
Flat |
process-05 P |
SOR.5005 |
Flat |
process-05 M |
SOR.5005 |
Flat |
Dawn-base
- Bring in images and update
- 7.3 res_pole (Long lunch, large change)
Dawn-partial
- Autoregister sequence
- Batch autoregister sequence
- Batch parallel autoregister
- Batch Register
Dawn-image
This state has several LAMO images ingested into the system. There are no new landmarks. The shape model is well defined and stable. There are no specific bigmaps for the test region.
Dawn-land
This state has a single landmark defined, TEST01. It is in the center of our testing region, based to show details of the pits within Marcia crater. It has HAMO and LAMO images already connected to the landmark and aligned. No overlaps or updated topography. Heights are from an existing bigmap.
Notes: lithos update is done for most lithos commands. It will not be explicitly tested because saving the data is required for most of the tests.
- Shift - These are paired in sequence
Dawn-land360
This contains 361 maplets that tiles REFMAP. It only has the processing done for doing the batch tiling procedures. The goal for this stage is developing mature topography.
- Do parallel processing - LONG (1/2 day)
- Work on export/import - LONG (1/2 day)
- Group for doing tiles - LONG (1/2 day)
Dawn-Topo
This contains a full suite of tiles for REFMAP (360 maplets). It has been well processed and has fully developed topography.
- Making shape files
== Other
||