== SPC Test Wish List == Here are the tests that are desired to be done during Phase E || Test || Description || Priority || Customer || || Action || || Pole Wobble || Test the new modules that were changed in support of the Rosetta mission to support Pole Wobble. Std error. || Action || SPOC || || Shape 3 redo || Run Approach phase testing to see if the improved procedures performs as well as test F4 || Action || Jackson || || Max Slope || Do a paremeter study of the impact of the MXSLP variable, currently used for 0.6 || Action || Jackson || || OLA Albedo Integration || Work out integration of albedo into OLA || Action || Lockheed - Lorenz || || Pole and Omega on F4 || Need to run the pole and omega using F4's final shape model. May need Gaskell to train || Action || Palmer || || High || || FDS Integration || Develop the procedures and run an Approach/PreSurvey test that works on the transition to landmark navigation that contains multiple sets of data being passed || High || FDS || || Image Quality || Generate a shape model using low(er) quality images that contain PSF, blur, hot pixels and cosmic rays || High || AltWG || || Asteroid wall || Process Lockheed's asteroid wall || High || Lockheed || || NFT-SPC Thread Test || Generate NFT Features and use for Decent to TAG simulation || High || Lockheed - Lorenz || || Medium || || Operations Test: Parallel processing and team || Run Preliminary Survey and Detailed Survey portions of the mission using multiple people and multiple machines || Medium || SPOC || || Update F2/F3 with Cross Correlation || Recompute the RMS using manually process and a Normalized Cross Correlation || Medium || Palmer || || Low || || Wiki version || Update Wiki with version number on all modules || Low || Palmer || || Go to Tahiti || Need a vacation || Low -- never going to happen || Palmer || Anybody want anything else?