Size: 845
Comment:
|
Size: 1525
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
The first graph shows footprints for all Detailed Survey PolyCam images which were included in the model. The second graph shows the four images down-selected due to their coverage of the 20m x 20m evaluation region, and their almost complete containment within the iterated 100m x 100m region. |
|
Line 15: | Line 17: |
Distance magnitude is plotted for the full Detailed Survey PolyCam image set. 3D graphs of final SCOBJ and truth is then plotted for each image. The first four are the down-selected evaluation images, the rest of the set is included for comparison. {{attachment:scobj_distance_resized.png}} === Evaluation Pictures === |
|
Line 16: | Line 24: |
{{attachment:P601372862G2_final_resized.png}} {{attachment:P601372868G2_final_resized.png}} {{attachment:P601372874G2_final_resized.png}} === Remaining Detailed Survey PolyCam Pictures === |
|
Line 32: | Line 48: |
{{attachment:P601372862G2_final_resized.png}} {{attachment:P601372868G2_final_resized.png}} {{attachment:P601372874G2_final_resized.png}} |
TestF3G - Results
CompareOBJ RMS
Image Footprints
The first graph shows footprints for all Detailed Survey PolyCam images which were included in the model. The second graph shows the four images down-selected due to their coverage of the 20m x 20m evaluation region, and their almost complete containment within the iterated 100m x 100m region.
Distance SCOBJ(truth) to SCOBJ(solution)
Distance magnitude is plotted for the full Detailed Survey PolyCam image set. 3D graphs of final SCOBJ and truth is then plotted for each image. The first four are the down-selected evaluation images, the rest of the set is included for comparison.
Evaluation Pictures