Block 14 - Shift V2
Description
If the model has more than <criteria> of deviation from the center of figure, then shift it to be centered
Procedure
Set-up
Set the ID. This should be the current ID, not the new one (which will really just be moved)
ID=farV03 echo "Shifting the model, $ID = shapeVar" | tee -a notes
Record the current offset and make a new model that will be adjusted
cd SHAPEFILES echo shape-$ID-512 | shape_info | tee -a ../notes cp shape-$ID-512 shift-$ID.txt cd ..
Run the shift command.
(Comment -- Unsure if the shape needs to be installed before geometry is run) Notice, the shape model cannot have the .TXT at the end with the shift program. FDS sends the offset with the sign flipped from what the shift program will use. FDS should have a note about this along with their delivery.
murphy /usr/local/bin/shift OffsetX OffsetY OffsetZ y shift-<whatever> n y geometry 20 1 n n
Install Shape
Install the shape and review the fit to our main images
cd SHAPEFILES echo shift-$ID.txt | shape_info | tee -a ../notes relink.sh shift-$ID.txt SHAPE.TXT | tee -a ../notes cd .. evalReg.sh lsupport/theEight
Finish the Block
echo 11 | blockFinish far\
Continue the process
While this completes the block, you still need to do the following procedures to make the shape model solid
(Compiled by EEP)