Test 01: First Boulder

Aim and Objectives

Purpose of test: Standard procedure was not creating accurate boulders (see transit below). The boulder was fuzzy, and there was actually a depression where the boulder was located. We wanted to see if tiling by hand could achieve a better solution.

boulder.png Purple is truth, green is model

Additional Objectives

Methodology

Procedures Start with a 35cm GSD and tile by hand. Step the GSD down by about a factor of 2 until reaching a 5cm GSD.

Data

Results

Conclusions and Recommendations