'''Purpose of test:''' Standard procedure was not creating accurate boulders (see transit below). The boulder was fuzzy, and there was actually a depression where the boulder was located. We wanted to see if tiling by could achieve a better solution. | '''Purpose of test:''' Standard procedure was not creating accurate boulders (see transit below). The boulder was fuzzy, and there was actually a depression where the boulder was located. We wanted to see if tiling by hand could achieve a better solution. |
Test 01: First Boulder
Aim and Objectives
Purpose of test: Standard procedure was not creating accurate boulders (see transit below). The boulder was fuzzy, and there was actually a depression where the boulder was located. We wanted to see if tiling by hand could achieve a better solution.
Purple is truth, green is model
Additional Objectives
- This was our first attempt at tiling by hand, so we were gaining experience with special cases.
Methodology
Data
- Approach and Detailed Survey images of Shape 3.7.
Results
- We tiled at higher and higher GSD, but we were not able to get to a high enough GSD to properly represent the boulder. The image pixel size was just not high enough to support the small maplets needed to properly represent the boulder.
Conclusions and Recommendations
- If we want to accurately represent these large boulders, we will need better images. This may require additional image planning during the mission if we need to properly represent these large boulders.