Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2016-05-19 11:50:46
Size: 1156
Editor: EricPalmer
Comment:
Revision 5 as of 2016-05-19 12:21:13
Size: 1276
Editor: EricPalmer
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:

Line 9: Line 7:
|| Pole Wobble || Test the new modules that were changed in support of the Rosetta mission to support Pole Wobble || Very High || SPOC ||
|| Image Quality || Generate a shape model using low(er) quality images that contain PSF, blur, hot pixels and cosmic rays || High || AltWG ||
|| Shape 3 redo || Run Approach phase testing to see if the improved procedures performs as well as test F4 || Medium || AltWG ||
|| Asteroid wall || Process Lockheed's asteroid wall || High || Lockheed ||
|| Operations Test: Parallel processing and team || Run Preliminary Survey and Detailed Survey portions of the mission using multiple people and multiple machines || Medium || SPOC ||
|| NFT-SPC Thread Test || Generate NFT Features and use for Decent to TAG simulation || High || Lockheed - Lorenz ||
|| OLA Albedo Integration || Work out integration of albedo into OLA || High || Lockheed - Lorenz ||
Line 10: Line 15:
|| Pole Wobble || Test the new modules that were changed in support of the Rosetta mission to support Pole Wobble || Very High || SPOC ||
Line 12: Line 16:
|| Image Quality || Generate a shape model using low(er) quality images that contain PSF, blur, hot pixels and cosmic rays || High || AltWG ||

|| Shape 3 redo || Run Approach phase testing to see if the improved procedures performs as well as test F4 || Medium || AltWG ||

|| Asteroid wall || Process Lockheed's asteroid wall || High || Lockheed ||

|| Operations Test: Parallel processing and team || Run Preliminary Survey and Detailed Survey portions of the mission using multiple people and multiple machines || Medium || SPOC ||

|| NFT-SPC Thread Test || Generate NFT Features and use for Decent to TAG simulation || High || Lockheed - Lorenz ||
Anybody want anything else?

SPC Test Wish List

Here are the tests that are desired to be done during Phase E

Test

Description

Priority

Customer

FDS Integration

Develop the procedures and run an Approach/PreSurvey test that works on the transition to landmark navigation that contains multiple sets of data being passed

High

FDS

Pole Wobble

Test the new modules that were changed in support of the Rosetta mission to support Pole Wobble

Very High

SPOC

Image Quality

Generate a shape model using low(er) quality images that contain PSF, blur, hot pixels and cosmic rays

High

AltWG

Shape 3 redo

Run Approach phase testing to see if the improved procedures performs as well as test F4

Medium

AltWG

Asteroid wall

Process Lockheed's asteroid wall

High

Lockheed

Operations Test: Parallel processing and team

Run Preliminary Survey and Detailed Survey portions of the mission using multiple people and multiple machines

Medium

SPOC

NFT-SPC Thread Test

Generate NFT Features and use for Decent to TAG simulation

High

Lockheed - Lorenz

OLA Albedo Integration

Work out integration of albedo into OLA

High

Lockheed - Lorenz

Anybody want anything else?

Test_wish_list (last edited 2016-07-26 18:11:23 by EricPalmer)