Line 9: | Line 9: |
|| Shape 3 redo || Run Approach phase testing to see if the improved procedures performs as well as test F4 || Medium || AltWG || | || Shape 3 redo || Run Approach phase testing to see if the improved procedures performs as well as test F4 || Action || Jackson || |
Line 14: | Line 14: |
|| Max Slope || Do a paremeter study of the impact of the MXSLP variable, currently used for 0.6 || Action || Jackson || |
SPC Test Wish List
Here are the tests that are desired to be done during Phase E
Test |
Description |
Priority |
Customer |
FDS Integration |
Develop the procedures and run an Approach/PreSurvey test that works on the transition to landmark navigation that contains multiple sets of data being passed |
High |
FDS |
Pole Wobble |
Test the new modules that were changed in support of the Rosetta mission to support Pole Wobble |
Very High |
SPOC |
Image Quality |
Generate a shape model using low(er) quality images that contain PSF, blur, hot pixels and cosmic rays |
High |
AltWG |
Shape 3 redo |
Run Approach phase testing to see if the improved procedures performs as well as test F4 |
Action |
Jackson |
Asteroid wall |
Process Lockheed's asteroid wall |
High |
Lockheed |
Operations Test: Parallel processing and team |
Run Preliminary Survey and Detailed Survey portions of the mission using multiple people and multiple machines |
Medium |
SPOC |
NFT-SPC Thread Test |
Generate NFT Features and use for Decent to TAG simulation |
High |
Lockheed - Lorenz |
OLA Albedo Integration |
Work out integration of albedo into OLA |
High |
Lockheed - Lorenz |
Max Slope |
Do a paremeter study of the impact of the MXSLP variable, currently used for 0.6 |
Action |
Jackson |
Anybody want anything else?