Version
- v3.0A2 - Blessed Class B
- v3.0.1 - Updated to support Level 0
- v3.0.2 - Fixed Autoregister
- v3.0.3 - Fixed CR-324. Small issues
- v3.0.4 - Bug fix for albedo - averaged adjoining pixels
- v3.0.5 - 2nd bug fix for albedo - averaged only useful adjoining pixels
Systems
Testing
- spc-legacy - Running 3.0A2 - This system used to be ormacsrv1.
- ormacsrv2 - Running 3.0.5
Operations
- spc1 - Running 3.0.5 (24 cores)
- spc2 - Running 3.0.5 (24 cores)
- spc3 - Running 3.0.5 (24 cores)
- spc4 - Running 3.0.5 (24 cores)
- spc5 - Running 3.0.5 (8 core machine)
- ormacsrv1 - Distribution only. No SPC code
Software Changes
- ECR-0077 - OCAMS Image Orientation (flipping the images horizontally)
- CR-324 - Buf and format fixes to SPC 3.0.2 in time for Bennu late approach
- STER 75 - residuals RMS value
- STER 80 - Syn search location for SCOBJ_SHIFT.TXT
- STER 81 - Fix pinhole to focal plane shift in REGRES
- STER 83 - SPC Image names consistent with other tools
- STER 84 - Photometric model was not updated for the published version that includes the factor of 2
- STER 85 - Charge the frame transfer time value to be a configuration value
Categories
A quick links to changes in each software's manual
3.0A2 - CategoryThreeAlphaTwo - Baseline for all Pre-launch testing
3.0.1 - CategoryThreeOhOne -- This includes
3.0.1 - process_fits, make_sumfiles, regres
3.0.2 - (no user interface or function change -- minor bug only to autoregister)
3.0.3 - CategoryThreeOhThree - feature in register and INIT_LITHOS.TXT
Useful OREx info
Cameras
Shape Model Deliveries (FDS, Draft, Final)
Delivery Date
Name
Source Data
Resolution
Error
Who
17 Nov
Limber_300A.v1
9 and 12 Nov
2.5, 2.0m
4m
Team
23 Nov
Limber_150B.v1
13, 16, 19 Nov
2.0, 1.8, 1.6m
FDS
29 Nov
Limber_150C.v1
23, 25 Nov
1.3, 1.1m
FDS
5 Dec
Limber_150D.v1
27, 29 Nov, 1 Dec
90, 70 40 cm
FDS
7 Dec
Limber_150E.v1 (skipped)
2 Dec
30cm
FDS
12 Dec
Approach150.v1
All Approach (Was model D)
2m
Team
14 Dec
SPC_75NP.v1
4, 5 Dec (LUT) 8, 9 Dec
75cm
FDS
18 Dec
SPC_75EQ.v1
12, 13 Dec
75cm
FDS
21 Dec
SPC_75SP.v1
15, 16 Dec
75cm
FDS
31 Dec
SPC_75Draft.v1
All App &PS
75cm
1m
FDS
21 Jan
PS_75.v1
All App &PS
75cm
1m
Team
Approach, 8-22 Nov, 162-100km, 2.2-1.4m Close Approach, 25Nov - 2 Dec, 82-23km, 1.1-0.31m PreSurvey, 4-16 Dec, 11-7km, .82-.50m
Old Testing Things
SPC_V_and_V_testing - Directions and guideline for testing
Test_wish_list -- What tests should we run
Software Status -- Software check-in and status record
ORex_specific -- Info about the configuration used at the SPOC