Line 16: Line 16:
 * ormacsrv2 - Running 3.0.2  * ormacsrv2 - Running 3.0.5
Line 19: Line 19:
 * spc1 - Running 3.0.2
 * spc2 - Running 3.0.2
 * spc1 - Running 3.0.5 (24 cores)
 * spc2 - Running 3.0.5 (24 cores)
 * spc3 - Running 3.0.5 (24 cores)
 * spc4 - Running 3.0.5 (24 cores)
 * spc5 - Running 3.0.5 (8 core machine)

Version

  • v3.0A2 - Blessed Class B
  • v3.0.1 - Updated to support Level 0
  • v3.0.2 - Fixed Autoregister
  • v3.0.3 - Fixed CR-324. Small issues
  • v3.0.4 - Bug fix for albedo - averaged adjoining pixels
  • v3.0.5 - 2nd bug fix for albedo - averaged only useful adjoining pixels


Systems

Testing

  • spc-legacy - Running 3.0A2 - This system used to be ormacsrv1.
  • ormacsrv2 - Running 3.0.5

Operations

  • spc1 - Running 3.0.5 (24 cores)
  • spc2 - Running 3.0.5 (24 cores)
  • spc3 - Running 3.0.5 (24 cores)
  • spc4 - Running 3.0.5 (24 cores)
  • spc5 - Running 3.0.5 (8 core machine)
  • ormacsrv1 - Distribution only. No SPC code


Software Changes

  • ECR-0077 - OCAMS Image Orientation (flipping the images horizontally)
  • CR-324 - Buf and format fixes to SPC 3.0.2 in time for Bennu late approach
    • STER 75 - residuals RMS value
    • STER 80 - Syn search location for SCOBJ_SHIFT.TXT
    • STER 81 - Fix pinhole to focal plane shift in REGRES
    • STER 83 - SPC Image names consistent with other tools
    • STER 84 - Photometric model was not updated for the published version that includes the factor of 2
    • STER 85 - Charge the frame transfer time value to be a configuration value


Categories

A quick links to changes in each software's manual


Useful OREx info

Cameras


Shape Model Deliveries (FDS, Draft, Final)

  • Delivery Date

    Name

    Source Data

    Resolution

    Error

    Who

    17 Nov

    Limber_300A.v1

    9 and 12 Nov

    2.5, 2.0m

    4m

    Team

    23 Nov

    Limber_150B.v1

    13, 16, 19 Nov

    2.0, 1.8, 1.6m

    FDS

    29 Nov

    Limber_150C.v1

    23, 25 Nov

    1.3, 1.1m

    FDS

    5 Dec

    Limber_150D.v1

    27, 29 Nov, 1 Dec

    90, 70 40 cm

    FDS

    7 Dec

    Limber_150E.v1 (skipped)

    2 Dec

    30cm

    FDS

    12 Dec

    Approach150.v1

    All Approach (Was model D)

    2m

    Team

    14 Dec

    SPC_75NP.v1

    4, 5 Dec (LUT) 8, 9 Dec

    75cm

    FDS

    18 Dec

    SPC_75EQ.v1

    12, 13 Dec

    75cm

    FDS

    21 Dec

    SPC_75SP.v1

    15, 16 Dec

    75cm

    FDS

    31 Dec

    SPC_75Draft.v1

    All App &PS

    75cm

    1m

    FDS

    21 Jan

    PS_75.v1

    All App &PS

    75cm

    1m

    Team

Approach, 8-22 Nov, 162-100km, 2.2-1.4m Close Approach, 25Nov - 2 Dec, 82-23km, 1.1-0.31m PreSurvey, 4-16 Dec, 11-7km, .82-.50m