Differences between revisions 2 and 3
Revision 2 as of 2018-05-17 11:30:50
Size: 2771
Editor: EricPalmer
Comment:
Revision 3 as of 2018-05-21 07:13:14
Size: 2886
Editor: EricPalmer
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:


Day 1

 * Intro and setup
 * Theory
 * Lunch
 * Lithos landmarks

 * tile 120


Day 2

 * clean 120
 *


Day 3




Line 5: Line 29:
   * [[attachment:NDA.doc]]

Day 1

  • Intro and setup
  • Theory
  • Lunch
  • Lithos landmarks
  • tile 120

Day 2

  • clean 120

Day 3


  • Day 1, Wednesday
    • Introductions and facilities
      • Check the install the software and test cases
      • Introduce SPC and Bob
    • Intro SPC Lesson_1.pdf

      • Show wiki
      • Provide documentations, unix help
    • Theory of SPC
    • Basic SPC operation
      • Build landmarks Lesson 2

      • Fixing landmarks
      • Landmark management
      • Notes from day 1 - Helping cheat sheet

      • Manual shift
      • Global shift
  • Lunch



  • Day 3, Thursday
  • Notes, Day 4

  • Iteration (continuation from yesterday)
    • Fix landmarks from the iterate
    • Clean up the directory using rem_script.b
  • Build shape model -- Call it H2-Test2-
    • Change the support/buildShape.sh file
    • Install the shape model
  • Add Preliminary Survey images to the shape model
    • Register -- done
    • Autoregister the new images -- see notes
    • Iterate over the north pole landmarks
    • Build shape model -- Call it H2-Test3-
  • Tile the TAG site at 75 cm -- see notes
    • Review tools and technique to describe errors
      • CompareOBJ
      • Other tools
    • Error analysis

Information Needed

ImDayModel-draft (last edited 2018-06-05 21:02:24 by EricPalmer)