Day 1
- Intro and setup
- Theory
- Lunch
- Lithos landmarks
- tile 120
Day 2
- clean 120
Day 3
- Day 1, Wednesday
- Introductions and facilities
- Check the install the software and test cases
- Introduce SPC and Bob
Intro SPC Lesson_1.pdf
- Show wiki
- Provide documentations, unix help
- Theory of SPC
- Basic SPC operation
Build landmarks Lesson 2
- Fixing landmarks
- Landmark management
Notes from day 1 - Helping cheat sheet
- Manual shift
- Global shift
- Introductions and facilities
- Lunch
Install spc_tools and updateDisplay
- Batch shift
- Day 2, Thursday
Discuss training levels Training_Notes#Training_levels
- Review SPC from yesterday
Make more landmarks Notes Day 2
- Introduce Lat/Lon tiling
- Show
- "find" in lithos
Show register
- Day 3, Thursday
- Work with the new model
- Correct landmarks that threw errors
- Build the Shape model
- Define a big map
- Show how to generate
- Show how to display
Setup and run a Standard_iteration Block 5 - Iterate
bigmap part 2
- Build maplets using a map
- Overlaps
- Practice
- Register
- Fixing landmarks
Introduce autoregister
- Iteration (continuation from yesterday)
- Fix landmarks from the iterate
- Clean up the directory using rem_script.b
- Build shape model -- Call it H2-Test2-
- Change the support/buildShape.sh file
- Install the shape model
- Add Preliminary Survey images to the shape model
- Register -- done
- Autoregister the new images -- see notes
- Iterate over the north pole landmarks
- Build shape model -- Call it H2-Test3-
- Tile the TAG site at 75 cm -- see notes
- Review tools and technique to describe errors
- CompareOBJ
- Other tools
- Error analysis
- residuals
Shape model evaluation criteria Processing States
- Review tools and technique to describe errors
Information Needed
tile_120cm_seed - the seed file to tile at 120cm
tile_75cm_seed - the seed file to tile at 75cm
tile_30cm_seed - the seed file to tile at 30cm
make_scriptT_120.in - the list of latitude/longitudes needed to tile at the 120 cm level
make_scriptT_075.in - the list of latitude/longitudes needed to tile at the 75 cm level
make_scriptT_030.in - the list of latitude/longitudes needed to tile at the 30 cm level